4D BIM Modeling - Improve Cost, Scheduling and Coordination of Building Project

A New Perspective in the AEC Industryconventional scheduling. Some of the significant
1910! A solid 99 years to the present, Henry Laurenceconsiderations are as follows:
Gantt, an American mechanical engineer designed aVisualization of the Project: 4D model enables the
chart popularly called Gantt chart, named after him, toscheduler to view the entire construction site in a
monitor progress of the project against time constraint.nutshell. The scheduler is able to move around, look
It has long been a popular technique for projectoutside, inside and under the building and verify the
planning. But it lacks something to be desired when itprogress of project. It helps the scheduler to detect
comes to visualizing a project timeline. 4D model is theinconsistency and avoid visual incongruities in the
solution to it. 4D model is a 3D CAD model attached torepresentation.
the fourth dimension of time via a schedule. ThoughBetter Integration and Cost Estimation: Integrating
the concept of 4D scheduling has been around overhuman resources, equipment and material resources
20 years, it has not been popular due to somewith the BIM model, 4D scheduling helps to better
technical challenges associated with it. The continuousschedule and cost estimate of the project. 4D BIM also
advancement in technology and the emergence ofmonitors procurement status of project materials.
Building Information Modeling (BIM) have removed allConflict Detection and Resolution: During design and
challenges associated with 4D scheduling. With theconstruction phase, potential spatial conflicts may arise
increasing success of BIM in the realm of designs, thebetween building components. It is not easy to identify
adoption of 4D modeling is becoming the norm today.or predict these conflicts using 2D or 3D layouts. But,
Rich with information, BIM modeling services deliver4D model identifies various issues related to space,
architects a wealth of design-centric tasks and homeschedule and sequencing, and resolve them ahead of
builders a number of significant benefits includingthe construction process.
increased coordination, constructability analysis, BOQ,Improved Time Management: Integrated with BIM
quantification, and cost estimation and so on. One ofmodeling, 4D scheduling helps the owner as well as
the most important developments in buildingproject team to easily visualize time constraints and
applications for BIM is the project planning whereopportunities of improvement and investment in the
design and construction come together. At the core ofproject.
a project planning, there lies building design, theMaximization of Critical Resources: 4D model allows
backbone of a project planning. 4D scheduling plays anthe project team to evaluate various alternatives
important role in project planning.resources and scopes of work over a period of time
It includes vital data such as start and finish date ofto optimize the resources and labor accordingly.
each component and their criticality. 4D model delivers4D Project Planning with BIM
minute details to the project team. It works as aBy adding the schedule date to the model
platform for project team and other non-technicalcomponents, project team improves the plan and
stakeholders to visualize the assembling of a buildingintegrates the communication among various divisions.
over time. With 4D construction simulation process,With the progress of time, project team
architects can evaluate various options and chooseprogrammatically links schedule to BIM model to
the best alternative at project design phase.evaluate various construction options to make the
4D Modeling Offers Significant Benefits over 3Doptimum decision. There are two methods for linking a
ModelingBIM model to a project plan-
4D model is a further development over 3D model. It1. Direct link between Revit and MS project, and
challenges and changes many of the practices of2.